Abstract:This paper has presented a method to map full support of a non-circle tunnel onto a annular domain.The mapping function can be obtained by means of the optimiization techniques of mixed penalty function.Themethod is based on the conformal transformation of doubly connected odmain,this overcomes the shortcomings incalculating mapping function of doubly connected domain by means of single domain method. The precision of map-ping function obtained is higher than that of the latter.
吕爱钟;. 非圆形硐室封闭整体式支护映射函数确定的新方法[J]. 岩土工程学报, 1995, 17(4): 38-44.
Lv Aizhong. A NeW MethOd of Determintion Of the Mapping Function for a Non-circle Tunnel with FuII Support. Chinese J. Geot. Eng., 1995, 17(4): 38-44.