孙建生. “矢量和法”抗滑稳定计算模型的力学概念错误[J]. 岩土工程学报, 2021, 43(5): 975-980.
SUN Jian-sheng. Mechanical concept errors in anti-sliding stability computational model of "vector sum method". Chinese J. Geot. Eng., 2021, 43(5): 975-980.
[1] 朱大勇, 卢坤林, 台佳佳, 等. 基于数值应力场的极限平衡法及其工程应用[J]. 岩石力学与工程学报, 2009, 28(10): 1969-1975. (ZHU Da-yong, LU Kun-lin, TAI Jia-jia, et al.Limit equilibrium method based on numerical stress field and its application to engineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(10): 1969-1975. (in Chinese)) [2] 葛修润. 岩石疲劳破坏的变形控制律、岩土力学试验的实时X射线CT扫描和边坡坝基抗滑稳定分析的新方法[J]. 岩土工程学报, 2008, 30(1): 1-20. (GE Xiu-run. Deformation control lew of rock fatigue failure, real-time X-ray CT scan of geotechnical testing,new method of stability analysis of slopes and dam foundation[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(1): 1-20. in Chinese)) [3] 刘艳章, 葛修润, 李春光, 等. 基于矢量法安全系数的滑坡与坝基稳定分析[J]. 岩石力学与工程学报, 2007, 26(10): 2130-2140. (LIU Yan-zhang, GE Xiu-run, LI Chun-guang, et al.Stability analysis of slope and dam foundation based on vector method safety factor[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(10): 2130-2140. (in Chinese)) [4] 吴振君, 葛修润. 求解边坡矢量和安全系数的条分法[J]. 岩土力学, 2009, 30(8): 2337-2342. (WU Zhen-jun, GE Xiu-run.Solving vector sum factor of safety of method of slices[J]. Rock and Soil Mechanics, 2009, 30(8): 2337-2342. (in Chinese)) [5] 郭明伟, 李春光, 葛修润, 等. 基于矢量和分析方法的边坡边坡滑面搜索[J]. 岩土力学, 2009, 30(6): 1775-1781. (GUO Ming-wei, LI Chun-guang, GE Xiu-run, et al.Searching potential slip surface of slopes based on the vector sum analysis method[J]. Rock and Soil Mechanics, 2009, 30(6): 1775-1781. (in Chinese)) [6] 邓琴, 郭明伟, 李春光, 等. 基于边界元法的边坡矢量和稳定分析[J]. 岩土力学, 2010, 31(6): 1971-1976. (DENG Qin, GUO Ming-wei, LI Chun-guang, et al.Vector sun method for slope stability analysis boundary element method[J]. Rock and Soil Mechanics, 2010, 31(6): 1971-1976. (in Chinese)) [7] 沈华章, 张国发, 王水林, 等. 基于矢量分析法的边坡下滑推力计算[J]. 岩土力学, 2016, 37(4): 1096-1108. (SHEN Hua-zhang, ZHANG Guo-fa, WANG Shui-lin, et al.Calculation of downslide thrust of slope based on vector analysis method[J]. Rock and Soil Mechanics, 2016, 37(4): 1096-1108. (in Chinese)) [8] 刘艳章. 边坡及坝基抗滑稳定的矢量和分析方法研究[D]. 武汉: 中国科学院武汉岩土力学研究所, 2007. (LIU Yan-zhang.Vector Sun Analysis Method of Slopes and Dam Foundation Stability Against Sliding[D]. Wuhan: Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, 2007. (in Chinese)) [9] 郭明伟, 葛修润, 李春光, 等. 边坡和坝基抗滑稳定分析的三维矢量和法及其工程应用[J]. 岩石力学与工程学报, 2010, 29(1): 8-20. (GUO Min-wei, GE Xiu-run, LI Chun-guang, et al.Three dimensional vector sum method employed in slope and dam foundation stability analysis and its applications to practical engineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(1): 8-20. (in Chinese)) [10] 郭明伟, 葛修润, 李春光, 等. 基于矢量和方法的边坡稳定性分析中整体下滑趋势方向的探讨[J]. 岩土工程学报, 2009, 31(4): 577-583. (GUO Ming-wei, GE Xiu-run, LI Chun-guang, et al.Study on potential sliding direction in slope stability analysis based on vector sum method[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 577-583. (in Chinese)) [11] 沈辉, 罗先启, 李野, 等. 乌东德拱坝坝肩三维抗滑稳定分析[J]. 岩石力学与工程学报, 2012, 31(5): 1026-1033. (SHEN Hui, LUO Xian-qi, LI Ye, et al.Three- dimensional stability analysis of dam abutment of Wudongde arch dam[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(5): 1026-1033. (in Chinese)) [12] 罗勇, 周春梅, 吴燕玲, 等. 基于矢量和法的矿山边坡稳定性分析[J]. 武汉工程大学学报, 2010, 32(12): 43-46. (LUO Yong, ZHOU Chun-mei, WU Yan-ling, et al.Stability analysis of mine slope based on vector sun analysis method[J]. Journal of Wuhan Institute of Technology, 2010, 32(12): 43-46. (in Chinese)) [13] 赵家成, 吴剑, 晏华斌. 矢量和方法在重力坝深层抗滑稳定评价上的应用[J]. 水电能源科学, 2013, 31(1): 53-56. (ZHAO Jia-cheng, WU Jian, YAN Hua-bin.Application vector sum analysis method in gravity dam stability evaluation against deep slilding[J]. Water Resources and Power, 2013, 31(1): 53-56. (in Chinese)) [14] 秦晓艳, 金鑫, 介玉新, 等. 加筋土边坡的矢量和法稳定分析[J]. 水力发电学报, 2012, 31(5): 223-249. (QIN Xiao-yan, JIN Xin, JIE Yu-xin, et al.Stability analysis on reinforced soil slopes with vector sum analysis method[J]. Journal of Hydroelectric Engineering, 2012, 31(5): 223-249. (in Chinese)) [15] 沈华章, 郭明伟, 王水林, 等. 基于离散元的边坡矢量和稳定分析方法研究[J]. 岩土力学, 2016, 37(2): 592-600. (SHEN Hua-zhang, GUO Ming-wei WANG Shui-lin, et al. Vector sum method for slope stability analysis based on discrete elements[J]. Rock and Soil Mechanics, 2016, 37(2): 592-600. (in Chinese)) [16] 邹烨, 郭明伟, 王水林, 等. 地震荷载下三维边坡动力稳定分析[J]. 岩石力学与工程学报, 2017, 36(5): 1174-1184. (ZOU Ye, GUO Ming-wei, WANG Shui-lin, et al.Dynamic stability analysis of three dimensional slopes under seismic loads[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36(5): 1174-1184. (in Chinese)) [17] 平曈其, 罗先启, 郑安兴. 地震作用下裂隙对岩质边坡稳定性影响分析[J]. 岩土力学, 2015, 38(2): 600-606. (PING Tong-qi, LUO Xian-qi, ZHENG An-xing.Analysis of influence of cracks on rock slope stability under seismic loading[J]. Rock and Soil Mechanics, 2015, 38(2): 600-606. (in Chinese)) [18] 薛海斌, 党发宁, 尹小涛, 等.应变软化边坡稳定性分析[J]. 岩土工程学报, 2016, 38(3): 570-576. (XUE Hai-bin, DANG Fa-ning, YIN Xiao-tao, et al.Stability analysis method for strain softening slopes[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(3): 570-576. (in Chinese)) [19] 张海涛, 罗先启, 沈辉, 等. 基于矢量和的滑面应力稳定分析方法[J]. 岩土力学, 2018, 39(5): 1691-1699. (ZHANG Hai-tao, LUO Xian-qi, SHEN Hui, et al.Vector-sum-based slip surface stress method for analyzing slip mass stability[J]. Rock and Soil Mechanics, 2018, 39(5): 1691-1699. (in Chinese)) [20] 王伟, 陈国庆, 郑水全, 等. 考虑张拉-剪切渐进破坏稳定性分析[J]. 岩土力学, 2019, 40(增刊1): 468-476. (WANG Wei, CHEN Guo-qing, ZHENG Shui-quan, et al.Study on the Vector sum method of slope considering tensile-shear progressive failure[J]. Rock and Soil Mechanics, 2019, 40(S1): 468-476. (in Chinese)) [21] 邹烨, 严东方. 基于矢量和法的三维边坡滑面搜索研究[J]. 水利与建筑工程学报, 2019, 17(4): 107-111, 171.(ZOU Ye, YAN Dong-fang. Critical slip surface of three dimensional slope based on vector sun method[J], Journal of Water Resources and Architectural Engineering, 2019, 17(4): 107-111, 171. (in Chinese)) [22] 孙加平, 魏星, 宋保保. 基于最小势能原理的三维边坡稳定矢量和法[J]. 长江科学院院报, 2020, 37(11): 102-106. (SUN Jia-ping, WEI Xing, SONG Bao-bao.Vector sum analysis method for analyzing the stability of three dimensional slope based on minimum potential energy[J]. Journal of Yangtze River Scientific Research Institute, 2020, 37(11): 102-106. (in Chinese)) [23] 孙建生. 基于有限元应力载荷宏观刚性滑裂面极限平衡稳定计算理论[J]. 岩石力学与工程学报, 2018, 37(4): 862-875. (SUN Jian-sheng.Theoretical model of stability calculation of macro-rigid sliding planes with FEM stress load based on limit equilibrium[J]. Chinese Journal of Rock Mechanics and Engineering, 2018, 37(4): 862-875. (in Chinese)) [24] 葛修润, 任建喜, 李春光, 等. 三峡左厂3#坝段深层抗滑稳定三维有限元分析[J]. 岩土工程学报, 2003, 25(4): 389-394. (GE Xiu-run, REN Jian-xi, LI Chun-guang, et al.3D-FEM analysis of deep sliding stability of #3 dam foundation of left power house of three Gorges Project[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(4): 389-394. (in Chinese))