Model tests on the long-term settlement of pile-net composite structure subgrade for high-speed railways
LÜ Xi-lin1, 2, MA Quan1, 2, FANG Hang1, 2
1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China; 2. Department of Geotechnical Engineering, TongjiUniversity, Shanghai 200092, China
Abstract:The settlement control of the high-speed railway subgrade plays an important role in comfortable and safe running of high-speed train. With the growth of operation time, the long-term settlement of railway in soft subgrade has been concerned. Based on the Xuzhou-Shanghai section of Beijing-Shanghai high-speed railway, the model tests on the pile-net composite structure subgrade under dynamic loading were carried out, and the variation rules of subgrade settlement, stress ratio of pile-soil, and axial force distribution were obtained. The results show that in the first 1000 loading cycles, the subgrade settlement increases with loads significantly, and then it reached a constant value. The deformation of soil is larger than that of pile at the upper pile position, the negative friction resistance appears, and the neutral point of pile is located near 2/3 pile length away from the pile top. The axial force of pile increases with the increase of the cycles of loads, when the loading cycles reach 40000, the axial forces doesn't obviously increase.
吕玺琳,马泉,方航. 高铁桩网复合结构路基长期运营沉降模型试验研究[J]. 岩土工程学报, 2017, 39(s1): 140-144.
LÜ Xi-lin, MA Quan, FANG Hang. Model tests on the long-term settlement of pile-net composite structure subgrade for high-speed railways. Chinese J. Geot. Eng., 2017, 39(s1): 140-144.
[1] ROGBECK Y, FRANZÉN G, SCANDIACONSULT C A, et al. Nordic guidelines for reinforced soils and fills[R]. Baraboo: Nordic Geosynthetic Group, 2003. [2] BERGADO D T, LONG P V, MURTHY B R S. A case study of geotextile-reinforced embankment on soft ground[J]. Geotextiles and Geomembranes, 2002, 20(6): 343-365. [3] CHENG J, ZHANG J W. Research on stress distribution of cfg pile-net composite foundation in high-speed railway[C]// Applied Mechanics and Materials. 2013: 1833-1837. [4] PAN Z H, YAN K M, WU J B, et al. The dynamic analysis of soft soil subgrade in high-speed railway strengthened by PHC pile[J]. Advanced Materials Research, 2014: 908-911. [5] JAMSAWANG P, YOOBANPOT N, THANASISATHIT N, et al. Three-dimensional numerical analysis of a DCM column-supported highway embankment[J]. Computers and Geotechnics, 2016, 72: 42-56. [6] 肖 宏. 高速铁路无碴轨道桩网结构路基研究[D]. 成都:西南交通大学, 2007. (XIAO Hong. Study on column-net structure embankments of ballastless track in high speed railway[D]. Chengdu: Southwest Jiaotong University, 2007. (in Chinese)) [7] 焦栋梁. 循环荷载下桩承加筋土复合地基模型试验研究[D]. 杭州: 浙江大学, 2010. (JIAO Dong-liang. Model test research on geogrid-reinforced and pile-supported foundation under cyclic loading[D]. Hangzhou: Zhejiang University, 2010. (in Chinese)) [8] 孙晋永. 桩承加筋土复合地基模型试验研究[D]. 大连: 大连理工大学, 2010. (SUN Jin-yong. The model test research on geogrid-reinforced and pile-supported foundation[D]. Dalian: Dalian University of Technology, 2010. (in Chinese)) [9] 于进江, 程谦恭, 贺宏武, 等. 超大面积深厚软土桩-网复合地基承载性状模型试验研究[J]. 岩土力学, 2012, 33(11): 3323-3330. (YU Jin-jiang, CHEN Qian-gong, HE Hong-wu, et al. Model test research on bearing behavior of pile-net composite foundation on oversized deep soft soil[J]. Rock and Soil Mechanics, 2012, 33(11): 3323-3330. (in Chinese)) [10] 韩高孝, 宫全美, 周顺华. 列车动荷载下桩网结构路基土拱效应试验研究[J]. 岩土力学, 2014, 35(6). (HAN Gao-xiao, GONG Quan-mei, ZHOU Shun-hua. Experimental study of soil arching effect in geogrid reinforced pile supported embankment under train dynamic load[J]. Rock and Soil Mechanics, 2014, 35(6). (in Chinese)) [11] 陈仁朋, 陈金苗, 汪焱卫, 等. 桩网结构路基应力传递特性及累积沉降规律[J]. 土木工程学报, 2015, 48(增刊2): 241-245. (CHEN Ren-peng, CHEN Jin-miao, WANG Yan-wei, et al. Stress transmission and cumulative settlement characteristics of geogrid reinforced pile supported embankment[J]. China Civil Engineering Journal, 2015, 48(S2): 241-245. (in Chinese))