Estimation of shield tunnelling-induced ground surface settlements by virtual image technique
LIN Cun-gang1, XIA Tang-dai2, LIANG Rong-zhu2, WU Shi-ming3
1. College of Civil, Construction and Environmental Engineering, Ningbo University, Ningbo 315211, China; 2. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China; 3. Hangzhou Qing-chun Road Cross-River Tunnel Company Limited, Hangzhou 310002, China
Abstract:The accurate estimation of ground surface subsidence induced by shield tunnelling is crucial to the protection of buildings or structures in the vicinity. Under the hypothesis that the soil is a homogeneous isotropic incompressible linear-elastic semi-infinite half-space, equations for calculation of tunnelling-induced ground surface settlements under different surrounding soil intrusion models are derived based on the virtual image technique. Compared with those of numerical integration methods, the predicted results by the proposed method are more accurate. For the soil in reality is anisotropic, layered and compressible, the transverse ground surface settlement trough width is over-estimated both by this study and the numerical integration method. A modification parameter of trough width is introduced into the deduced formula. The modified method is proved by the field observations to be an easy and reliable method for prediction of ground surface settlements resulting from ground loss during construction of shield-driven tunnels.
[1] SAGASETA C. Analysis of undrained soil deformation due to ground loss[J]. Géotechnique, 1987, 37(3): 301-320. [2] VERRUIJT A, BOOKER J R. Surface settlements due to deformation of a tunnel in an elastic half plane[J]. Géotechnique, 1996, 46(4): 753-756. [3] LOGANATHAN N, POULOS H G. Analytical prediction for tunneling-induced ground movements in clays[J]. Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(9): 846-856. [4] LEE K M, ROWE R K, LO K Y. Subsidence owing to tunneling: I Estimating the gap parameter[J]. Canadian Geotechnical Journal, 1992, 29(6): 929-940. [5] LOGANATHAN N, POULOS H G, XU K J. Ground and pile-group responses due to tunnelling[J]. Soils and Foundations, 2001, 41(1): 57-67. [6] CHI S Y, CHERN J C, LIN C C. Optimized back-analysis for tunneling-induced ground movement using equivalent ground loss model[J]. Tunnelling and Underground Space Technology, 2001, 16(3): 159-165. [7] PARK K H. Elastic solution for tunneling-induced ground movements in clays[J]. International Journal of Geomechanics, 2004, 4(4): 310-318. [8] PARK K H. Analytical solution for tunnelling-induced ground movement in clays[J]. Tunnelling and Underground Space Technology, 2005, 20(3): 249-261. [9] 姜忻良, 赵志民. 镜像法在隧道施工土体位移计算中的应用[J]. 哈尔滨工业大学学报, 2005, 27(6): 801-803. (JIANG Xin-liang, ZHAO Zhi-min. Application of image method in calculating tunneling-induced soil displacement[J]. Journal of Harbin Institute of Technology, 2005, 27(6): 801-803.(in Chinese)) [10] 姜忻良, 赵志民. 盾构施工引起土体位移的空间计算方法[J]. 华中科技大学学报 (城市科学版),2005, 22(2): 1-12. (JIANG Xin-liang, ZHAO Zhi-min. 3-D analysis method used to calculate shield tunneling induced soil displacements[J]. Journal of Huazhong University of Science and Technology (Urban Science Edition), 2005, 22(2): 1-12. (in Chinese)) [11] 卢海林, 赵志民, 方 芃, 等. 盾构法隧道施工引起土体位移与应力的镜像分析方法[J]. 岩土力学, 2007, 28(1): 45-50. (LU Hai-lin, ZHAO Zhi-min, FANG Peng, et al. Analytical method of image theory used to calculate shield tunneling induced soil displacements and stresses[J]. Rock and Soil Mechanics, 2007, 28(1): 45-50. (in Chinese)) [12] LIN C G, ZHANG Z M, WU S M, et al. Key techniques and important issues for slurry shield under-passing embankments: A case study of Hangzhou Qiantang River Tunnel[J]. Tunnelling and Underground Space Technology, 2013, 38: 306-325. [13] SAGASETA C. Discussion: Analysis of undrained soil deformation due to ground loss[J]. Géotechnique, 1988, 38(4): 647-649. [14] PECK R B. Deep excavations and tunneling in soft ground[C]// State of the Art Report. Proceedings of 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico City, 1969: 225-290. [15] VERRUIJT A, BOOKER J R. Discussion: surface settlements due to deformation of a tunnel in an elastic half plane[J]. Géotechnique, 1998, 48(5): 709-713.[15] 16 17 根据《茅以升科学技术奖—土力学及岩土工程大奖奖励条例》(简称条例,请登录学会网站查阅www.geochina-cces.cn),凡具备《条例》中所列条件者,可申请本奖,青年奖候选人宜在2014年10月31日前未满45岁。本奖的评审工作是在茅以升科技教育基金委员会的领导下,根据《茅以升科学技术奖—土力学及岩土工程大奖评审细则》开展评审工作。由中国土木工程学会设立的茅以升土力学及岩土工程大奖评审委员会负责。评审委员会的日常工作委托中国土木工程学会土力学及岩土工程分会负责办理。 18 中国土木工程学会土力学及岩土工程分会秘书处;电话:010-62797915;传真:010-62785593;E-mail: cismge@tsinghua.edu.cn。 19 (中国土木工程学会土力学及岩土工程分会 供稿)