Cast-in-place pile by double dynamic drilling in complex formation
ZOU Zheng-sheng1, QIAN Zhong-xiao2, KONG Chao3, KONG Qing-hua1, 4
1. College of Civil Engineering, Henan Polytechnic University, Jiaozuo 454003, China; 2. Ningbo Zhongqian Building Engineering Co. Ltd., Ningbo 315040, China; 3. Ningbo Kender Building Science and Technology Co. Ltd., Ningbo 315040, China; 4. Zhejiang Huazhan Engineering Research and Design Institute, Ningbo 315010, China
Abstract:The common method used in construction of bored piles in complex formation, such as “three-large-stone” formation and rock, is the punching method. Sometimes, blasting, rotary drilling, DHD (down-hole hammer drilling), or their composite method are also used in the same formation. However, the pile-forming efficiency is lower due to the complex pile-forming process. The upper and lower rotary power devices, high pressure DHD, alloy boring crown and spiral drill pipe, produced by Korea, are integrated with Chinese domestic hydraulic walking or crawler pile machine, and the casing pipe is designed as the drill tool. Then a double dynamic drilling tool with high drilling ability in the complex formation is formed. Drilling cutting is discharged from the unearthed port by spiral drill pipe, so the defect of poor slag dumping in wet ground for DHD is overcome. The technology of fast plugging pipe is used to shorten the connect time and reduce the starting friction between the pipes and the soils in pipe sinking and pulling. The new method is a kind of environmental protection construction method due to the soil slag dry-dumping technique. Engineering practice shows that 5~7 piles are made by using the new method in 1 day. Compared with that of the punching method, the pile-forming efficiency is greatly improved by the new method.
邹正盛, 钱忠晓, 孔超, 孔清华. 复杂地层双动钢管护壁灌注桩施工技术[J]. 岩土工程学报, 2013, 35(zk2): 1188-1191.
ZOU Zheng-sheng, QIAN Zhong-xiao, KONG Chao, KONG Qing-hua. Cast-in-place pile by double dynamic drilling in complex formation. Chinese J. Geot. Eng., 2013, 35(zk2): 1188-1191.
[1] 郑石仁. 大“三石”层的钻进成孔方法浅议[J]. 探矿工程, 1993(3): 24-25. (ZHENG Shi-ren. A preliminary study on the drilling method in “three-large-stone” formation[J]. Exploration Engineering, 1993(3): 24-25. (in Chinese)) [2] 许厚材, 唐章伟, 熊青山. 含巨大孤石地层钻进成孔方法浅析[J]. 世界地质, 2000, 19(3): 307-312. (XU Hou-cai, TANG Zhang-wei, XIONG Qing-shan. Drilling technique in large boulder formation[J]. World Geology, 2000, 19(3): 307-312. (in Chinese)) [3] 刘姝娜, 朱永光. 灌注型嵌岩桩施工中的卡锤问题及对策[J]. 水运工程, 2011(2): 137-139, 148. (LIU Shu-na, ZHU Yong- guang. Problems and countermeasures of hammer blocking in construction of pouring rock-socketed piles[J]. Port & Waterway Engineering, 2011(2): 137-139, 148. (in Chinese)) [4] 崔宗明, 方建斌, 李士辉. 刍议砼防渗墙孔故的处理[J]. 河南水利, 2004(4): 35. (CUI Zong-ming, FANG Jian-bin, LI Shi-hui. A rustic opinion on the drilling accident treatment of concrete cut-off wall[J]. Henan Water Resources, 2004(4): 35. (in Chinese)) [5] 邓 辉. 小爆破技术在桥梁桩基施工中的应用[J]. 铁道建筑技术, 2010(11): 63-66. (DENG Hui. Application of small blasting technology in bridge pile foundation construction [J]. Railway Construction Technology, 2010(11): 63-66. (in Chinese)) [6] 王 海, 蒋荣庆. 聚能爆破在大直径硬岩钻进中的应用前景[J]. 探矿工程, 1999(6): 46-48. (WANG Hai, JIANG Rong-qing. Application prospects of energy accumulation blasting on drilling in hard rock with large diameter[J]. Exploration Engineering, 1999(6): 46-48. (in Chinese)) [7] 陈进心, 廖 勇, 贠双基, 等. 乌金峡水电站二期围堰高喷防渗墙施工难点及对策[J]. 水利水电施工, 2009(1): 34-36. (CHEN Jin-xin, LIAO Yong, YUN Shuang-ji, et al. Construction difficulties and countermeasures of jet grouting cut-off wall of the second phase cofferdam at Wujin Gorge Hydropower Station[J]. Water Conservancy and Hydropower Construction, 2009(1): 34-36. (in Chinese)) [8] 刘睦峰, 彭振斌, 王建军. 复杂岩层大直径嵌岩桩钻进技术[J]. 地质与勘探, 2009, 45(5): 621-626. (LIU Mu-feng, PENG Zhen-bin, WANG Jian-jun. Research on drilling technology of large diameter rock-embedded pile in complex rock[J]. Geology and Exploration, 2009, 45(5): 621-626. (in Chinese)) [9] 李式仁, 陶 义, 马建文, 等. 长螺旋钻孔桩在岩石地基上的应用[J]. 工业建筑, 2001, 31(10): 74-77. (LI Shi-ren, TAO Yi, MA Jian-wen. Application of long auger bored pile to rock foundation[J]. Industrial Construction, 2001, 31(10): 74-77. (in Chinese)) [10] 李式仁, 陈德文. 长螺旋钻孔嵌岩桩施工工艺[J]. 岩土工程学报, 2001, 23(6): 741-745. (LI Shi-ren, CHEN De-wen. Construction techniques of long bored pile embedded in rock[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(6): 741-745. (in Chinese)) [11] 陈 志. 聚能爆破在大漂石、孤石桩孔中的应用[J]. 探矿工程, 1993(3): 24-25. (CHEN Zhi. Application of energy accumulation blasting on pile-hole drilling in large boulders formation[J]. Exploration Engineering, 1993(3): 24-25. (in Chinese)) [12] 郑石仁. 含孤石地基钻孔桩试桩施工[J]. 探矿工程, 1995(1): 31-32. (ZHENG Shi-ren. Construction of test piles in large boulders formation[J]. Exploration Engineering, 1995(1): 31-32. (in Chinese))