3D numerical analysis of influence of construction of underlying mining area on existing road tunnel structures
GONG Jian-wu1, XIA Cai-chu2, LEI Xue-wen1, ZHOU Da-hua3, GAO Shi-jun4
1. College of Urban Construction, Wuhan University of Science and Technology, Wuhan 430065, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 3. Shiyan-Baihe Expressway Construction Administration, Shiyan 442000, China; 4. Guizhou Transportation Planning Survey & Design Academe Co., Ltd., Guiyang 550001, China
Abstract:Based on the FEM method, a 3D numerical model for mining areas under the existing road tunnels is established. The analysis is made on the deformation and mechanical characteristics of structures during the construction of tunnels and mining areas so as to investigate the influence of construction of underlying mining areas on the existing tunnel structures. The results show that the influence of the underlying mining areas on the road tunnels is significant. The effect range of the mining area on the road tunnels is about 25 m from its centerline alone the tunnel axis, while the main effect distance of construction of the mining area on the tunnel structures is about 30 m before and after the centerline from the working face to the tunnel. The adverse effect must be taken into consideration during the design and construction of road tunnels in the mining area, and some monitoring and pre-strengthening methods should be adopted.
龚建伍, 夏才初, 雷学文, 周大华, 高世军. 下伏矿采施工对既有隧道结构影响三维模拟分析[J]. 岩土工程学报, 2013, 35(zk2): 120-125.
GONG Jian-wu, XIA Cai-chu, LEI Xue-wen, ZHOU Da-hua, GAO Shi-jun. 3D numerical analysis of influence of construction of underlying mining area on existing road tunnel structures. Chinese J. Geot. Eng., 2013, 35(zk2): 120-125.
[1] 黄 磊, 卢义玉, 粟登峰, 等. 公路隧道穿越急倾斜采空区的治理技术[J]. 公路交通科技, 2012, 29(11): 80-85. (HUANG Lei, LU Yi-yu, SU Deng-feng. Treatment technology of highway tunnel through steep inclined goaf[J]. Journal of Highway and Transportation Research and Development, 2012, 29(11): 80-85. (in Chinese)) [2] 黄 明, 张旭东, 刘华荣, 等. 采空区大跨连拱隧道围岩稳定分析及其加固[J]. 广西大学学报, 2012, 37(1): 128-133. (HUANG Ming, ZHANG Xu-dong, LIU Hua-rong. Stability analysis of surrounding rock of large-span arch tunnel in coal gob and its reinforcement[J]. Journal of Guangxi University, 2012, 37(1): 128-133. (in Chinese)) [3] 邱礼球, 王彦虎. 高速公路隧道通过煤矿采空区施工技术[J]. 隧道建设, 2008, 28(5): 616-619, 627. (QIU Li-qiu, WANG Yan-hu. Construction technology of highway tunnel crossing mined-out[J]. Tunnel Construction, 2008, 28(5): 616-619, 627. (in Chinese)) [4] 姜 杰, 常 明. 灵石隧道之石膏矿采空区设计研究[J]. 山西交通科技, 2009(4): 37-38, 63. (JIANG Jie, CHANG Ming. The discussion on the design of highway tunnel in mined-out area[J]. Shanxi Science & Technology of Communications, 2009(4): 37-38, 63. (in Chinese)) [5] 侯浙学. 葵岗隧道煤层采空区段的处治技术[J]. 建筑科学, 2008, 24(3): 116-117. (HOU Zhe-xue. Treatment technology of the coal goaf in Kuigang tunnel[J]. Building Science, 2008, 24(3): 116-117. (in Chinese)) [6] 王 联. 西山坪隧道隧底煤层采空区的整治[J]. 现代隧道技术, 2007, 44(6): 74-76. (WANG Lian. Treatment of the coal measures worked-out area below Xishanping[J]. Modern Tunnelling Technology, 2007, 44(6): 74-76. (in Chinese)) [7] 赵庚亮, 文富源. 隧道通过岩溶和采空区施工方案探讨[J]. 隧道建设, 2008, 28(6): 716-719. (ZHAO Geng-liang, WEN Fu-yuan. Study on construction scheme of tunnelling through karst and gob area[J]. Tunnel Construction, 2008, 28(6): 716-719. (in Chinese)) [8] 王树仁, 张海清, 慎乃齐, 等. 下伏采空区桥隧工程变形及受力响应特征分析[J]. 岩石力学与工程学报, 2009, 28(6): 1144-1151. (WANG Shu-ren, ZHANG Hai-qing, SHEN Nai-qi. Analysis of deformation and stress characteristics of highway tunnels above mined-out regions[J]. Chinese Journal of Rock Mechanics And Engineering, 2009, 28(6): 1144-1151. (in Chinese)) [9] 张志沛, 彭 惠, 杨锡平. 喜口池隧道穿越煤矿采空区段稳定性分析与研究[J]. 煤炭工程, 2011, 7(7): 70-72. (ZHANG Zhi-pei, PENG Hui, YANG Xi-ping. Stability analysis and research on the road section of xikouchi tunnel crossing the gobs[J]. Coal Engineering, 2011, 7 (7): 70-72. (in Chinese)) [10] 张仲魁. 兰渝铁路熊洞湾隧道煤矿采空区施工安全控制技术[J]. 现代隧道技术, 2012, 49(4): 133-139. (ZHANG Zhong-kui. Construction safety controls of the xiongdongwan tunnel passing through the coal mine goaf[J]. Modern Tunnelling Technology, 2012, 49(4): 133-139. (in Chinese)) [11] 崔志盛, 赵 凯, 龚建伍. 公路隧道下伏采空区施工影响数值模拟分析[J]. 探矿工程, 2011, 38(7): 76-79. (CUI Zhi-sheng, ZHAO Kai, GONG Jian-wu. Numerical analysis on construction effect of underlying goaf on road tunnels[J]. Exploration Engineering, 2011, 38(7): 76-79. (in Chinese)) [12] 张 娇, 姜谙男, 易南概, 等. 东坪金矿采空区开挖过程的三维有限元数值模拟[J]. 中国矿业, 2006, 15(11): 81-84. (ZHANG Jiao, JIANG An-nan, YI Nan-gai. Numerical simulation of excavation process of dongping mine worked out area based on 3d-finite element method[J]. China Mining Magazine, 2006, 15(11): 81-84. (in Chinese)) [13] 李学良. 采空区问题的数值模拟方法分析[J]. 煤矿安全, 2012, 12: 193-196. (LI Xue-liang. Numerical simulation method analysis for goaf problem[J]. Safety in Coal Mines, 2012, 12: 193-196. (in Chinese)) [14] 张普纲. 采空区高速公路路基破坏的数值模拟分析[J]. 煤矿开采, 2012, 17(3): 74-76, 48. (ZHANG Pu-gang. Numerical simulation of expressway roadbed over mined gob[J]. Coal Mining Technology, 2012, 17(3): 74-76, 48. (in Chinese)) [15] 宋南涛, 陈炜韬, 王明年, 等. 煤系地层采空区对隧道施工安全性的影响[J]. 铁道建筑技术, 2007(3): 48-51. (SONG Nan-tao, CHEN Wei-tao, WANG Ming-nian. Safety analysis of tunnelling in coal-minded area[J]. Railway Construction Technology, 2007(3): 48-51. (in Chinese)) [16] 王树仁, 慎乃齐, 张海清, 等. 下伏采空区高速公路隧道变形特征数值分析[J]. 中国矿业, 2008, 17(3): 76-79, 81. (WANG Shu-ren, SHEN Nai-qi, ZHANG Hai-qing, et al. Numerical analysis of deformation characteristics for highway tunnels through the mined-up regions[J]. China Mining Magazine, 2008, 17(3): 76-79, 81. (in Chinese)) [17] 童立元, 刘松玉, 邱 钰. 高速公路下伏采空区危害性评价与处治技术[M]. 南京: 东南大学出版社, 2006. (TONG Li-yuan, LIU Song-yu, QIU Jue. Harmfulness evaluation and treatment technology of highway underlying the goaf[M]. Nanjing: South East University Press, 2006. (in Chinese))