Abstract:In order to meet the needs of compaction parameter control for construction of earth-rock dams under continuous process monitoring, the sustained over-speed duration time of roller velocity, continued non-qualification duration time of vibration status, compacted thickness and qualification rate of compaction pass are employed as the control indices of compaction quality of the entire working area. According to the correlation between the compactness of core wall materials and each of compaction parameters (e.g., compaction pass, compacted thickness, and gradation of materials moisture content), a multiple regression model is established. Furthermore, a Monte-Carlo simulation-based method is presented to determine the control standards for the qualification rate of compaction pass which meets the corresponding compaction quality control standards required in the current codes. The case study demonstrates that the compaction quality of all sampling pits in the core wall zone satisfies the design requirements according to the proposed control standards. It may provide an effective approach for compaction quality control of earth-rock dams under continuous construction process monitoring.
刘东海, 王倩, 崔博, 沈嗣元, 刘兴宁, 王奇峰. 连续监控下土石坝碾压参数的控制标准及其确定方法[J]. 岩土工程学报, 2013, 35(9): 1712-1716.
LIU Dong-hai, WANG Qian, CUI Bo, SHEN Si-yuan, LIU Xing-ning, WANG Qi-feng. Control standards for compaction parameters of earth-rock dams under continuous construction process monitoring. Chinese J. Geot. Eng., 2013, 35(9): 1712-1716.
[1] DL/T 5128—2001碾压式土石坝施工规范[S]. 北京: 中国电力出版社, 2001. (DL/T 5128—2001 Specifications for rolled earth-rockfill dam construction[S]. Beijing: China Electric Power Press, 2001. (in Chinese)) [2] ZHONG Deng-hua, CUI Bo, LIU Dong-hai. Theoretical research on construction quality real-time monitoring and system integration of core rock-fill dam[J]. Science in China (Series E: Technological Sciences), 2009, 52(11): 3406-3412. [3] ZHONG Deng-hua, LIU Dong-hai, CUI Bo. Real-time compaction quality monitoring of high core rockfill dam[J]. Science China—Technological Sciences, 2011, 54(7): 1906-1913. [4] 马洪琪, 钟登华, 张宗亮, 等. 重大水利水电工程施工实时控制关键技术及其应用[J]. 中国工程科学, 2011, 13(12): 20-27. (MA Hong-qi, ZHONG Deng-hua, ZHANG Zong-liang, et al. Key technologies of real-time construction control for major hydraulic and hydroelectric projects[J]. Engineering Science, 2011, 13(12): 20-27. (in Chinese)) [5] LIU Dong-hai, SUN Jing, ZHONG Deng-hua. Compaction quality control of earth-rock dam construction using real-time field operation data[J]. Journal of Construction Engineering and Management, ASCE, 2012, 138(9): 1085-1094. [6] 柳育刚. 心墙坝料压实质量实时评估理论方法及应用[D]. 天津: 天津大学, 2011. (LIU Yu-gang. Theory and its application of real-time compaction quality evaluation for earth-rock dam material at core wall[D]. Tianjin: Tianjin University, 2011. (in Chinese)) [7] SHANKLIN D W, RADEMACHER K R, TALBOT J R. Construction quality control by testing of compacted fills: Optimum moisture density values[C]// Symposium on Constructing and Controlling Compaction of Earth Fills. Seattle, WA: American Society Testing and Materials, 2000: 126-136. [8] TUMIDAJSKI P J, FIORE L, KHODABOCUS T. Comparison of Weibull and normal distribution for concrete compressive strengths[J]. Canadian Journal of Civil Engineering, 2006, 33(10): 1287-1292.