Vertical displacement of tube segment of immersed tunnels caused by sand flow construction
LI Wei1, 2, 3, FANG Ying-guang1, 2, MO Hai-hong1, 2, GU Ren-guo1, 2, CHEN Jun-sheng1, 2, YUAN Wei-yao4
1. School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510641, China; 2. State Key Laboratory of Subtropical Building Science, South China University of Technology, Guangzhou 510641, China; 3. Guangzhou Electric Power Design Institute, Guangzhou 510075, China; 4. Dongguan Jian-Qing Architectural Design Co., Ltd., Dongguan 523000, China
Abstract:By using the full-scale model tests on the sand-flow method, the whole process of vertical displacement of tube segment in the construction of immersed tunnel foundation treated by sand-flow method is simulated. The relative elevation versus time-history curves of the tube segment model, the amount of vertical displacement and the morphological characteristics of the sand deposit are obtained. The test results show that the model tests have three processes, that is, normal expansion of sand deposit, slow-beating displacement and fast-smooth displacement. The displacement amount and displacement rate of model in the slow-beating displacement process are smaller than those in the fast-smooth displacement process. The vertical displacement makes the gap area small and the chutes thin and densely distributed on the top surface of the sand deposit. Sand particles cumulate on the sand-deposit top and form horizontal layers, which causes the vertical displacement directly. The displacement process significantly affects the expansion of the sand deposit. The process of the slow-beating displacement can be used to reduce the thickness of the gap and chutes in engineering practice, but measures should be taken to ensure that the sand deposit radius meet the design requirements before the vertical displacement.
[1] KUESEL T R. Alternative concepts for undersea tunnels[J]. Tunnelling and Underground Space Technology, 1986,1(1):283-287. [2] 傅琼阁). 沉管隧道的发展与展望[J]. (中国港湾建设), 2004(5):53-58. (FU Qiong-ge. Development and prospect of immersed tunnels[J]. China Harbour Engineering, 2004(5): 53-58.( (in Chinese)) [3] 谭忠盛),(王梦恕),张 弥. 琼州海峡铁路隧道可行性研究探讨[J]. (岩土工程学报), 2001,23(2):139-143. (TAN Zhong-sheng, WANG Meng-shu, ZHANG Mi. A feasibility study on Qiongzhou Strait railway tunnel[J]. Chinese Journal of Geotechnical Engineering,2001,23(2): 139-143. (in Chinese) [4] 孙 钧. 海底隧道工程设计施工若干关键技术的商榷[J]. (岩石力学与工程学报), 2006,25(8):1 513-1521. (SUN Jun. Discussion on some key technical issues for design and construction of undersea tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(8): 1 513-1 521.(in Chinese) [5] 管敏鑫). 沉管隧道在越江工程中的地位以及有关的新认识[J]. (现代隧道技术), 2004,41(1):1-4. (GUAN Min-xin. The role of the tunneling by immersed tube method in the river-crossing engineering and some related new cognitions[J]. Modern Tunnelling Technology, 2004, 41(1): 1-4.( (in Chinese)) [6] 杨文武). 沉管隧道工程技术的发展[J]. (隧道建设), 2009,29(4):397-404. (YANG Wen-wu. Development of immersed tube tunneling technology[J]. Tunnel Construction, 2009, 29(4): 397-404.( (in Chinese)) [7] 陈韶章),陈 越,张 弥 沉管隧道设计与施工[M].北京:科学出版社,2002. (CHEN Shao-zhang, CHEN Yue, ZHANG Mi. Immersed tube tunnel design and construction[M]. Beijing: Science Press, 2002.(in Chinese) [8] 张庆贺),(高卫平). 水域沉管隧道基础处理方法的对比分析[J]. (岩土力学), 2003,24(增刊2):349-352. (ZHANG Qing-he, GAO Wei-ping. Comparison analysis on treatment methods of pipe-sinking tunnels[J]. Rock and Soil Mechanics, 2003, 24(S2): 349-352.( (in Chinese)) [9] GLERUM A. Developments in immersed tunnelling in Holland[J]. Tunnelling and Underground Space Technology, 1995,10(4):455-462. [10] VAN TONGEREN I H. The foundation of immersed tunnels[C]// Delta Tunnelling Symposium, Amsterdam. 1978: 48-57. [11] 黎志均). 珠江隧道工程基础灌砂试验研究[J]. (中国港湾建设), 2001(1):18-20. (LI Zhi-jun. Study of sand filled foundation for underwater tunnel crossing pearl river[J]. China Harbour Engineering, 2001(1): 18-20.( (in Chinese)) [12] 郑爱元),(谭忠盛),(李治国). 沉管隧道基础灌砂模拟试验[J]. (中国工程科学), 2009,11(7):81-85. (ZHENG Ai-yuan, TAN Zhong-sheng, LI Zhi-guo. Simulation experiment of pumped sand on immersed tunnel[J]. Engineering Sciences, 2009, 11(7): 81-85.( (in Chinese)) [13] 莫海鸿),(房营光),黎 伟,等. 砂流法处理沉管隧道地基的模型试验方法[J]. (广东土木与建筑), 2011,18(3):14-17. (MO Hai-hong, FANG Ying-guang, LI Wei, et al. Model test method for the foundation of immersed tunnel tube treated by sand flow method[J]. Guangdong Architecture Civil Engineering,2011,18(3): 14-17. (in Chinese) [14] 房营光),黎 伟,(莫海鸿),等. 沉管隧道地基砂流法处理的砂盘扩展规律试验与分析[J]. (岩石力学与工程学报), 2012,31(1):206-216. (FANG Ying-guang, LI Wei, MO Hai-hong, et al. Experiment and analysis of law of sand deposit expansion in foundation of immersed tube tunnel treated by sand flow method[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1): 206-216. (in Chinese) [15] 莫海鸿),黎 伟,(房营光),等. 沉管隧道底板面材质对砂流法地基影响的模型试验研究[J]岩石力学与工程学报, 2012, 31(7): 1452-1461.( (MO Hai-hong, LI Wei,FANG Ying-guang, et al. Model experimental research on effect of material of immersed tunnel bottom surface on foundation formed by sand-flow method[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(7):1452-1461. (in Chinese) [16] 郭建民),(魏立新),(杨文武). 广州市洲头咀隧道工程设计简介[J]. (现代隧道技术), 2008(增刊1):317-321. (GUO Jian-min, WEI Li-xin, YANG Wen-wu. designing introduction of the Guangzhou Zhoutouzui immersed tube tunnel[J]. Modern Tunnelling Technology, 2008(S1): 317-321.( (in Chinese)) [17] 洲头咀隧道介绍广州市市政工程设计研究院,茂盛(亚洲)工程顾问有限公司. 广州市洲头咀隧道工程施工图设计[R]. 广州: 广州市市政工程设计研究院, 茂盛(亚洲)工程顾问有限公司,2008. (Guangzhou Municipal Engineering Design and Research Institute, Maunsell Consultants Asia Limited. Construction documents design of Guangzhou Zhoutouzui tunnel[R]. Guangzhou:GuangzhouMunicipal Engineering Design and Research Institute, Maunsell Consultants Asia Limited, 2008. (in Chinese) [18] GB/T 501452007 土的工程分类标准[S]. 2007.( (China National Standards GB/T 501452007: Standard for engineering classification of soil[S]. 2007. (in Chinese)) [19] 潘永仁),彭 俊, NAOTAKE Saito. 上海外环沉管隧道管段基础压砂法施工技术[J]. (现代隧道技术), 2004,41(1):41-45. (PAN Yong-ren, PENG Jun, NAOTAKE Saito. Technology of sand injection for the foundation of immersed tube elements on the external ring of shanghai[J]. Modern Tunnelling Technology,2004,41(1): 41-45. (in Chinese) [20] VICTOR L, STREETER E, BENJAMIN Wylie,et al. Fluid mechanics[M]. 9th ed. Boston: WCB/McGraw-Hill Companies, 1998. [21] 杨小勇). 沉管隧道施工初探[J]. (西部探矿工程), 2006(6):140-142. (YANG Xiao-yong. Immersed tube tunnel construction[J]. West-China Exploration Engineering, 2006(6): 140-142.( (in Chinese))