Abstract: The covering top-down method can be better applied to large urban underground construction in city downtown areas, which is inverse in construction under the covering conditions. The design scheme for deep excavation of Pingleyuan Station of Beijing Metro line No. 14 is introduced. The stress characteristics, selection principles, design points of horizontal and vertical systems of the excavation are discussed. Some key problems are also analyzed. It may provide reference for similar projects.
王志红. 北京地铁平乐园站盖挖逆筑深基坑设计[J]. 岩土工程学报, 2012, 34(suppl): 699-704.
WANG Zhi-hong. Design of deep excavation of Pingleyuan Station of Beijing Metro using covering top-down method. Chinese J. Geot. Eng., 2012, 34(suppl): 699-704.
[1] 北京地铁十四号线平乐园站施工设计[R]. (Construction design of Pingleyuan station of Beijing metro line No.14[R]. (in Chinese))[2] GB 50157—2003 地铁设计规范[S]. (GB 50157—2003 Code for design of metro[S]. (in Chinese))[3] 刘国彬, 王卫东. 基坑工程手册[M]. 2版. 北京: 中国建筑工业出版社, 2009. (LIU Guo-bin, WANG Wei-dong. Excavation engineering manual[M]. 2nd ed. Beijing: China Architecture & Building Press, 2009. (in Chinese))[4] 刘 钊, 佘才高, 周振强. 地铁工程设计与施工[M]. 北京: 人民交通出版社, 2004. (LIU Zhao, SHE Cai-gao, ZHOU Zheng-qiang. Design and construction of metro engineering[M]. Beijing China Communications Press, 2004. (in Chinese))