Abstract:Based on the FEM for steady seepage,and combining with the analyse of parametric sensitivity and the objective function in optimal design,the construction schedule was taken as the objective function and the overflow hydraulic gradient and the construction time as the restrictive conditions,the optimization of depth of suspended anti-seepage wall in the cofferdam of a hydraulic power station in the Dadu River was performed.Variation of some sensitive parameters including the hydraulic gradient and the schedule with depth of suspended anti-seepage wall was analyzed,and the relationship among them was obtained through the normalization of thinking.The anti-seepage depth was obtained through the restraint condition,and the optimized depth was then yielded.The results were not only necessary for the economy and safety of the engineering construction,but also reasonable for the theorietical basis of the evaluation to suspended cut-off walls.
王晓燕;党发宁;田威;张建友;肖耀廷;. 大渡河某水电站围堰工程中悬挂式防渗墙深度的确定[J]. 岩土工程学报, 2008, 30(10): 1564-1568.
WANG Xiaoyan, DANG Faning, TIAN Wei, ZHANG Jianyou, XIAO Yaoting. Determination of depth of suspended cut-off walls in cofferdam of a hydraulic power station in Dadu River. Chinese J. Geot. Eng., 2008, 30(10): 1564-1568.