Abstract:A new 3D design and analysis method was put forward,including its theory,formulas and corresponding FEM software.Moreover,the 3D method and software was applied to the actual deep foundation pits in the city of Ningbo and the contrast analysis between the calculated data and measured data was presented.It was shown that the new design method was a kind of new solution for complicated deep foundation pits,and the ratio of the calculated data to the measured data was mostly in the range from 0.6 to 1.5.Therefore,the present method and software could be applied to actual design of foundation pits with safety and satisfactory economic benefit.Furthermore,it could be considered as the supplement or improvement to the active technical specification(JGJ120—99) to some extent.
陈伟;吴才德;黄吉锋;沈俊杰;王大卫;. 深基坑支护结构的三维分析原理、应用及验证[J]. 岩土工程学报, 2007, 29(5): 729-735.
CHEN Wei 1, WU Caide 2, HUANG Jifeng 1, SHEN Junjie 2, WANG Dawei 1. Theory, application and tests of 3D analysis method for deep foundation pits. Chinese J. Geot. Eng., 2007, 29(5): 729-735.