Settlement of piled raft foundation embedded in rock and its calculation method
HU Min-yun1, LU Yu-ke1, CHEN Xiao-yu1, ZHANG Qing-shan2, XU Xiao-bing1, ZHANG Yong1
1. Institue of Geotechnical Engineering, Zhejiang University of Technology, Hangzhou 310014, China; 2. Zhejiang University of Technology Engineering Design Group Co., Ltd., Hangzhou 310014, China
Abstract:Based on the settlement monitoring data of two piled rafts under a twin-tower building,the settlement characteristics of piled raft foundation is examined. It is shown that the piled raft settles as a whole underloading, while the settlement of piles under individual plate, which is located outside the tower areas, is sensitive to changing of the adjacent loading and ground water level. By comparing the measurement with the calculated settlement, it is found that the measured settlements are much greater than the calculated values. Then, two influential factors are proposed, bottom sediment in pile and negative skin friction on pile, to revise the settlement calculation equation for piled raft foundation penetrating thick soft soil layers. Finally, the proposed method and the suggested parameters are checked through two real cases.
胡敏云, 陆雨珂, 陈小雨, 张庆山, 徐晓兵, 张勇. 穿越软土层嵌岩桩筏基础沉降特征与计算方法[J]. 岩土工程学报, 2019, 41(S2): 221-225.
HU Min-yun, LU Yu-ke, CHEN Xiao-yu, ZHANG Qing-shan, XU Xiao-bing, ZHANG Yong. Settlement of piled raft foundation embedded in rock and its calculation method. Chinese J. Geot. Eng., 2019, 41(S2): 221-225.
[1] LEE J H, PARK D J.Analysis of load sharing behavior for piled rafts using normalized load response model[J]. Computers and Geotechnics, 2014, 57(1): 65-74. [2] 赵锡宏. 上海高层建筑桩筏与桩箱基础设计理论[M]. 上海: 同济大学出版社, 1989. (ZHAO Xi-hong.Shanghai high-rise building piled raft and piled box foundation design theory[M]. Shanghai: Tongji University Press, 1989. (in Chinese)) [3] BASILE F.Non-linear analysis of vertically loaded piled rafts. Computers and Geotechnics, 2015, 63(2): 73-82. [4] TARIQ M, CHAUDHARY A.FEM modelling of a large piled raft for settlement control in weak rock[J]. Engineering Structures, 2007, 29(3): 2901-2907. [5] 张忠苗. 浙江财富金融中心超长单桩与群桩实测沉降分析[J]. 岩石力学与工程学报, 2011, 30(增刊1): 3199-3207. (ZHANG Zhong-miao.Analysis of measured settlement of super-long piles and pile groups in Zhejiang Fortune Finance Center[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(S1): 3199-3207. (in Chinese)) [6] 刘金砺, 邱明兵. 单桩、单排桩、疏桩基础及其复合桩基的沉降计算[J]. 土木工程学报, 2007, 40(增刊): 152-158. (LIU Jin-li, QIU Ming-bing.Settlement calculation for pile foundation and composite piled foundation with single pile and sparse piles[J]. China Civil Engineering Journal, 2007, 40(S0): 152-158. (in Chinese)) [7] Braja M Das.Principles of foundation engineering[M]. 8th ed. United States of America: Timothy L Anderson, 2016: 481-485. [8] 钟闻华, 刘松玉, 张克恭. 群桩基础特性研究与实例分析[J]. 建筑结构, 2003, 33(11): 9-12. (ZHONG Wen-hua, LIU Song-yu, ZHANG Ke-gong.Characteristics of pile group foundation and case study[J]. Building Structure, 2003, 33(11): 9-12. (in Chinese))