Abstract:The main canal of the middle route of South to North Water Diversion Project for 1st class projects belong to over-sized of the water conveyance project, the canal section of the design flow rate of 285 m³/s~ 265 m³/s, increase the flow rate of 345 m³/s-320 m³/s. According to the middle route of Zhengzhou 1st section of terrain and meteorological , horological geology condition, main-canal seepage control and drainage design for the targeted research, calculation and design, puts forward a complete set of design thinking and scheme, so far the middle route of Zhengzhou 1st section of main canal running in good condition, show that the reliability and superiority of design scheme, for the following as a reference for the design of large water main canal.
[1] 何武全. 我国渠道防渗工程技术的发展现状与研究方向[J]. 防渗技术, 2002, 8(1): 31-33, 46. (HE Wu-quan. Research progress and development direction of construction technique of canal seepage control in China[J]. Seepage Control Technology; 2002, 8(1): 31-33, 46. (in Chinese)) [2] SL18—2004 渠道防渗工程技术规范[S]. (SL18—2004 Technical specification for canal seepage control engineering[S]. (in Chinese)) [3] GB50290—98 土工合成材料应用技术规范[S]. (GB50290—98 Technical specification for application of geotechnical synthetic materials[S]. (in Chinese)) [4] 沈树荣. 供水水文地质手册(第二册 水文地质计算)[M]. 北京: 地质出版社, 1977. (SHEN Shu-rong. Water supply and hydrological geology handbook (second volumes of hydrogeological calculation)[M]. Beijing: Geological Publishing House, 1977. (in Chinese)) [5] 朱 强. 渠道防渗与水资源合理利用[R]. 兰州: 甘肃省水利科学研究所, 1996. (ZHU Qiang. The rational utilization of water resources and water resources in canal[R]. Lanzhou: Gansu Institute of Water Conservancy Science, 1996. (in Chinese)) [6] 中华人民共和国水利部. SL18—91渠道防渗工程技术规范 [M]. 北京: 水利电力出版社, 1991. (The Ministry of Water Resources of the People's Republic of China. SL18—91 The canal seepage control engineering and technical specification[M]. Beijing: Water Conservancy and Electric Power Press, 1991. (in Chinese))